Orders Awarded |
 |
|
|
| Annexure-I |
Engineering
Projects (India) Ltd.
Regional Office |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
July 2010. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
| NIL |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
June 2010. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
| NIL |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
May 2010. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
NRO/CON/659/536 |
Construction of Academic building at Tripure University, Surya-Maninagar. |
Through website & published Newspaper |
16.04.10 |
Two Bid System |
30.04.10 |
(05) Five |
1) M/s Ramky Infrastructure Ltd. 2)M/s Reacon Engineers (I) Pvt. Ltd.
3)M/s Sikaria Infraprojects Pvt. Ltd.
4)M/s AMR Constructions Ltd.
5)M/s M.V. Omni Projects (India) Ltd. |
No one |
Yes |
NRO/CON/659/536 dated 31.05.2010 |
M/s Reacon Engineers (I) Pvt. Ltd |
47.58 |
20 Months |
| |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
April 2010. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
| NIL |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
March 2010. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
| NIL |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
February 2010. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
| NIL |
| Details of Contracts valuing Rs. 25 Crores and above concluded during the Month of January 2010. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No
. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date
of comple tion |
|
SRO/MKT/TH/ 01 |
Designing, constructing and commissioning including O & M for a period of 1 year of 100 MLD output capacity Water Treatment Plant at Maradu, Kochi.
|
EPI's website & leading newspaper |
07.10.08 |
Two |
17.11.08 |
03 Nos.
|
1. M/s. Mary Matha Construction Co. Kerala
2. M/s. BBIPL Infrastructure (India) Pvt.Ltd., Bangalore
3.M/s. IVRCL Infrastructure & Projects Ltd., Hyderabad |
NIL |
Yes |
SRO/MKT/T/544
dt.04.01.2010 dated 01.10.09 |
M/s. Mary Matha Construction Co. Kerala |
Rs. 47,13,04,770.00 |
20 months |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
December 2009. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
| NIL |
| Details of Contracts valuing Rs. 25 Crores and above concluded during the Month November 2009 |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
| NIL |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month October 2009. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No
. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date
of comple tion |
|
1. NRO/CON/JOKA-MEDICAL/496 |
Construction of ESIC-Hospital & Medical Collage at JOKA, Kolkata. |
Website
/Publication in Newspaper |
09.07.09 |
Two Bid System |
18.08.09 |
03(Three)
|
1. M/s Larsen & Toubro Limited (L&T)
2.M/s Prtibha-China State Joint Venture
3.M/s Shapoorji Pallonji & Co. |
NA |
Yes |
NRO/CON/JOKA-MEDICAL/496 dated
01.10.09 |
M/s Larsen & Toubro Limited (L&T) |
Rs.409.6 Cr. |
24 (Twenty four) Months |
|
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
September 2009. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No
. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date
of comple tion |
|
NRO/CON/
MANIKTALA-PG
/495 |
Renovation of Existing ESIC Hospital and PG College at Maniktala, Kolkata |
Website
/Publication in Newspaper |
10.07.09 |
Two Bid System |
13.08.09 |
04 (Four)
|
1.M/s Brahmaputra Infrastructure Ltd. 2.M/s GSJ Envo Limited 3.M/s RDB Industries Limited 4. M/s Vascon Engineers Ltd. |
NILL |
Yes |
NRO/CON/
MANIKTALA-
PG/495 Dated 23.09.09 |
M/s GSJ Envo Limited |
Rs.67.58 Cr. |
12 (Twelve) Months |
|
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
August 2009. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No
. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in
Crore |
Scheduled
date
of comple tion |
|
1. SRO/MKT/TH/34 |
Strengthening of Berths EQ-5 & EQ-6 and WQ-1 to WQ-3 to cater 12.50 m draft vessles in the Northern Area of Inner Harbour at Port of Visakhapatnam. |
EPI's website & leading newspaper |
24.02.2009 |
Two Bid |
06.03.2009 |
Three
|
1) M/s Aster Infratek Pvt.
Ltd. Hyderabad
2) M/s Sai Sudhir
Infrastructure Ltd,
Hyderabad
3) M/s Vinirrmaa Projects
Pvt. Ltd, Hyderabad. |
- |
Yes to L1 Party M/s Aster Infratek Pvt. Ltd. Hyderabad |
SRO/PCO/MKT/
T/129 dt. 25.08.2009 |
M/s Aster Infratek Pvt. Ltd. Hyderabad |
Rs. 33,19,05,634/- |
18 months |
|
1.ERO/MMD/629
/0846 |
Civil, Infrastructure, Site Grading-2 work (Part A) for BPCL at Lepetkata, Assam. |
Open |
23.07.2009 |
Two Bid |
10.08.2009 |
Three
|
1) M/s Neffs India (P) Ltd.
2) M/s Badri Rai & Co.
3) M/s M P Khaitan |
- |
Yes to L1 Party M/s Neffs India Pvt. Ltd. |
ERO/MMD/629/
0846 dtd. 25.08.2009 |
M/s Neffs India Pvt. Ltd |
Rs.
39,42,53,010/- |
By 11.09.2010 |
|
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
July 2009. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No
. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date
of comple tion |
| NIL |
|
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
June 2009. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No
. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date
of comple tion |
|
1. ERO/MKT/e-TEND site Grading 2.2008-09:85 |
Execution of Work Civil Infrastructure & Site Grading-2 (Part-A) for BCPL at Lepetkata, Assam. |
Open Tender |
30.12
.2008 |
Two Bid |
02.02.2009 |
Three
|
1) M/s Sanjib Krishna Deva Goswami
2) M/s Ramesh Kumar Jadeja
3) Neffs Intdia Pvt. Ltd. |
- |
Yes to L1 Party M/s Sanjib KrishnaDeva Goswami |
LOI- ERO/MMD/
629/0838 dtd. 15.05.09 &
W.O. dtd.
15.06.09 |
M/s Sanjib Krishna Deva Goswami |
Rs.39,52,57,950/- |
11.09.2010 |
|
| |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
May 2009. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
| NIL |
|
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
April 2009. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
| NIL |
|
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
March 2009. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
| NIL |
|
| |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
February 2009. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
| NIL |
|
| |
| Details of Contracts valuing Rs. 25 Crores and above concluded during the Month of January 2009. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No
. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date
of comple tion |
|
SRO/MKT/TH/19 & SRO/MKT/TH/GEN |
Construction of 468 CLASSIC (A-Type Flats) (Block no. 1 to 13) (Stilt+9 floors) including Infrastructure facilities for ANGARIKA Colony at Nustlapur(V), Thimmapur(M), in Karimnagar District under Rajiv Swagruha Scheme (Package-I) |
Open |
14.11.08 & 12.12.08 |
Two |
25.11.08 & 29.12.08 |
3+1
|
1) M/s AMR Constructions Ltd, Hyderabad
2) M/s Indu Projects Ltd, Hyderabad
3) M/s Nagarjuna Construction Co. Ltd, Hyderabad
4) M/s SVEC Constructions Ltd, Hyderabad. |
NIL |
Yes |
LOI no. SRO/PCO/MKT
/T/04-119 dt. 05.01.2009 |
M/s AMR Constructions, Hyderabad |
Rs.
66,60,20,
929.10/- |
24 months |
|
SRO/MKT/TH/19 & SRO/MKT/TH/GEN |
Construction of 720 INTRINSIC (B-Type Flats) (Block no. 14 to 33) (Stilt+9 floors) including Infrastructure facilities for ANGARIKA Colony at Nustlapur(V), Thimmapur(M), in Karimnagar District under Rajiv Swagruha Scheme (Package-II) |
Open |
14.11.08 & 12.12.08 |
Two |
25.11.08 & 29.12.08 |
3+1
|
1) M/s AMR Constructions Ltd, Hyderabad
2) M/s Indu Projects Ltd, Hyderabad
3) M/s Nagarjuna Construction Co. Ltd, Hyderabad
4) M/s SVEC Constructions Ltd, Hyderabad. |
NIL |
Yes |
LOI no. SRO/PCO/MKT
/T/04-120 dt. 05.01.2009 |
M/s AMR Constructions, Hyderabad |
Rs. 82,08,97
,366.70 |
24 months |
|
SRO/MKT/TH/19 & SRO/MKT/TH/GEN |
Construction of 720 INTRINSIC (B-Type Flats) (Block no. 34 to 53) (Stilt+9 floors) including Infrastructure facilities for ANGARIKA Colony at Nustlapur(V), Thimmapur(M), in Karimnagar District under Rajiv Swagruha Scheme (Package-III) |
Open |
14.11.08 & 12.12.08 |
Two |
25.11.08 & 29.12.08 |
3+1
|
1) M/s AMR Constructions Ltd, Hyderabad
2) M/s Indu Projects Ltd, Hyderabad
3) M/s Nagarjuna Construction Co. Ltd, Hyderabad
4) M/s SVEC Constructions Ltd, Hyderabad. |
NIL |
Yes |
LOI no. SRO/PCO/MKT
/T/04-121 dt. 05.01.2009 |
M/s AMR Constructions, Hyderabad |
Rs. 82,08,97
,366.70 |
24 months |
|
SRO/MKT/TH/19 & SRO/MKT/TH/GEN |
Construction of 792 BASIC (C-1 Type Flats) (Block no. 54 to 64) (Stilt+9 floors) including Infrastructure facilities for ANGARIKA Colony at Nustlapur(V), Thimmapur(M), in Karimnagar District under Rajiv Swagruha Scheme (Package-IV) |
Open |
14.11.08 & 12.12.08 |
Two |
25.11.08 & 29.12.08 |
3+1
|
1) M/s AMR Constructions Ltd, Hyderabad
2) M/s Indu Projects Ltd, Hyderabad
3) M/s Nagarjuna Construction Co. Ltd, Hyderabad
4) M/s SVEC Constructions Ltd, Hyderabad. |
NIL |
Yes |
LOI no. SRO/PCO/MKT
/T/04-122 dt. 05.01.2009 |
M/s AMR Constructions, Hyderabad |
Rs.
60,29,47
,236.50 |
24 months |
|
SRO/MKT/TH/19 & SRO/MKT/TH/GEN |
Construction of 1296 BASIC (C 2 Type Flats) (Block no. 65 to 76) (Stilt+9 floors) including Infrastructure facilities for ANGARIKA Colony at Nustlapur(V), Thimmapur(M), in Karimnagar District under Rajiv Swagruha Scheme (Package-V) |
Open |
14.11.08 & 12.12.08 |
Two |
25.11.08 & 29.12.08 |
3+1
|
1) M/s AMR Constructions Ltd, Hyderabad
2) M/s Indu Projects Ltd, Hyderabad
3) M/s Nagarjuna Construction Co. Ltd, Hyderabad
4) M/s SVEC Constructions Ltd, Hyderabad. |
NIL |
Yes |
LOI no. SRO/PCO/MKT
/T/04-123 dt. 05.01.2009 |
M/s AMR Constructions, Hyderabad |
Rs.
97,36,89,
844.70 |
24 months |
|
SRO/MKT/TH/19 & SRO/MKT/TH/GEN |
Construction of 1296 BASIC (C-2 Type Flats) (Block no. 77 to 88) (Stilt+9 floors) including Infrastructure facilities for ANGARIKA Colony at Nustlapur(V), Thimmapur(M), in Karimnagar District under Rajiv Swagruha Scheme (Package-VI) |
Open |
14.11.08 & 12.12.08 |
Two |
25.11.08 & 29.12.08 |
3+1
|
1) M/s AMR Constructions Ltd, Hyderabad
2) M/s Indu Projects Ltd, Hyderabad
3) M/s Nagarjuna Construction Co. Ltd, Hyderabad
4) M/s SVEC Constructions Ltd, Hyderabad. |
NIL |
Yes |
LOI no. SRO/PCO/MKT
/T/04-124 dt. 05.01.2009 |
M/s AMR Constructions, Hyderabad |
Rs.
97,36,89,
844.70 |
24 months |
|
SRO/MKT/TH/19 & SRO/MKT/TH/GEN |
Construction of 1080 CIVIC (D Type Flats) (Block no. 89 to 98) (Stilt+9 floors) including Infrastructure facilities for ANGARIKA Colony at Nustlapur(V), Thimmapur(M), in Karimnagar District under Rajiv Swagruha Scheme (Package-VII) |
Open |
14.11.08 & 12.12.08 |
Two |
25.11.08 & 29.12.08 |
3+1
|
1) M/s AMR Constructions Ltd, Hyderabad
2) M/s Indu Projects Ltd, Hyderabad
3) M/s Nagarjuna Construction Co. Ltd, Hyderabad
4) M/s SVEC Constructions Ltd, Hyderabad. |
NIL |
Yes |
LOI no. SRO/PCO/MKT
/T/04-125 dt. 05.01.2009 |
M/s AMR Constructions, Hyderabad |
Rs.
59,92,51,
208.20 |
24 months |
|
SRO/MKT/TH/19 & SRO/MKT/TH/GEN |
Construction of 972 CIVIC (D Type Flats) (Block no. 99 to 107) (Stilt+9 floors) including Infrastructure facilities for ANGARIKA Colony at Nustlapur(V), Thimmapur(M), in Karimnagar District under Rajiv Swagruha Scheme (Package-VIII) |
Open |
14.11.08 & 12.12.08 |
Two |
25.11.08 & 29.12.08 |
3+1
|
1) M/s AMR Constructions Ltd, Hyderabad
2) M/s Indu Projects Ltd, Hyderabad
3) M/s Nagarjuna Construction Co. Ltd, Hyderabad
4) M/s SVEC Constructions Ltd, Hyderabad. |
NIL |
Yes |
LOI no. SRO/PCO/MKT
/T/04-126 dt. 05.01.2009 |
M/s AMR Constructions, Hyderabad |
Rs.
68,34,54,
964.56 |
24 months |
|
SRO/MKT/F/04-GEN |
Providing and laying of MS rising mains, providing and laying of DI feeder mains, construction of WTP, OHT, providing and laying of DI and PVC distrubution net work for the work of combined Water Supply scheme to Kolar City, Bangarpet and Malur Towns under UIDSSMT |
Open |
22.07.08 |
Two |
26.08.08 |
3
|
1) M/s Jai Ganesh Constructions, Hyderabad
2) M/s GVPR Engineers Ltd, Hyderabad
3) M/s Sai sudhir Infrastructure Ltd, Hyderabad |
NIL |
Yes |
LOI no.
SRO/PCO/MKT
/T/04-118 A dt. 08.01.2009 |
M/s
Sai Sudhir
Infrastructures Ltd
,Hyderabad |
Rs.
83,85,57
,629.10 |
24 months |
|
ERO/MKT/e.Tend
/Bldg/2008-09/
67
dtd. 10.09.2008 |
Construction of Tezpur Medical College, Tezpur, Assam |
Open |
10.09.08 |
Two Bid (Pre Tender Tie-up) |
18.09.08 |
3
|
1. M/s Shree Gautam
Construction Co.Ltd,
Guwahati
2.M/s Coal Mines
Associated Traders,
Kolkata
3. M/s GPT Infraprojects
Ltd. Kolkata |
- |
Yes (L1) |
ERO/MMD/609
/0814 dtd. 06.01.2009 )
LOI & W.O.dtd
.23.01.09 |
M/s
M/s Shree Gautam Construction Co. Ltd.,Guwahati, Assam |
Rs.
117,92,
45,283/- |
24 months |
|
ERO/MKT/e.
Tend/Bldg/
2008-09/67
dtd.
10.09.2008 |
Construction of Fakruddin Ali Ahmed Medical College at Barpeta, Assam. |
Open |
10.09.08 |
Two Bid (Pre Tender Tie-up) |
18.09.08 |
3
|
1. M/s Shree Gautam
Construction Co.Ltd,
Guwahati
2.M/s Coal Mines
Associated Traders,
Kolkata
3. M/s GPT Infraprojects
Ltd. Kolkata |
- |
Yes (L1) |
ERO/MMD/
610/0815 dtd. 14.01.2009 )
LOI & W.O.dtd
.27.01.09 |
M/s
M/s Shree Gautam Construction Co. Ltd.,Guwahati, Assam |
Rs.
124,30,
18,731/- |
24 months |
|
| |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
December 2008. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No
. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date
of comple tion |
|
1. ERO/MMD/605
/0797A
dated 16.12.08 |
Construction of Extn. Of Orissa High Court Building at Cuttack. |
Open |
24.09.08 |
Two Bid |
30.10.08 |
Three
|
Three |
- |
Yes (L-1) |
ERO/MMD/
605-0797A
dtd.
02.12.2008 (LOI) & amended dtd. 16.12.2008 |
M/s Damodar Engineers Pvt. Ltd. |
Rs. 40,15,44,186/- |
24 months |
|
2. ERO/MMD/611
/0813
dated 01.01.09 |
Construction for civil Structural, Architectural and Electrical works for Plant Building-1 for Brahmaputra Petrochemical Complex, Assam |
Open |
14.07.08 |
Two Bid (Pre-Tender Tie-UP) |
22.07.08 |
Three
|
Three |
- |
Yes (L-1) |
ERO/MMD/
611/0813
dtd.
10.12.2008 (LOI) & 01.01.2009 (WO) |
M/s NEFFS(India) Pvt.Ltd. |
Rs.77,73,95,000/- |
16 months |
|
| |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
November 2008. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore
|
Scheduled
date of
comple
tion |
| NIL |
|
| |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
October 2008. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No
. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date
of comple tion |
|
1. SRO/MKT/F/04-GEN |
Puttur Water Supply
Scheme
under UIDSSMT-Investigation, design, execution of Puttur Water Supply
Scheme by Construction
of Storage Tank,
Off-take
Sluice, Raw Water Sump, Intake well cum Pump House, Treatment Plant, Clear Water sump, erection of pumping machinery, Construction
of Pump houses,
laying of raw water & clear water
pumping & gravity
mains, construction
of ELSRs, GLSRs, distribution network, including trail running and commi
ssioning
of the
scheme with G.N.S. as soruce. |
Open |
12.07.2008 |
Two |
17.07.2008 |
3 nos.
|
1) M/s Jal Ganesh
Constructions
,
Hyderabad
2) M/s SVEC
Constructions Ltd.,
Hyderabad
3) M/s Singan
Projects Ltd.,
Hyderabad |
NIL |
Yes |
LOI No.SRO/
PCO/
MKT/F/
04-111 dt. 07.10.2008 |
M/s Jal Ganesh Construc
tions, Hyderabad |
Rs.
50,61,61,041/- |
18 months |
|
2. MBI/MKT/B042
/012/NIT
|
Construction of State Sports Training Centre at Bilaspur (Chattisgarh) |
Open |
04.07.2008 |
Two Bid System |
11.07.2008 |
3 nos.
|
1) M/s Patel
Enterprises, Korba,
C.G.
2) M/s Rajasthan
Associates, Korba,
(C.G.)
3) M/s Bajarang Lal
Agarwal, Surajpur
(C.G) |
NIL |
Lowest Tenderer |
MBI/MMD
/607
/WO-059 dated 15.10.2008
|
1) M/s Patel
Enterprises
(Leader
Consortium of
2 parties)
A-3, 1st Floor,
Vikas
Complex,
P.H.Road,
Korba, (C.G.)
Tel: (07759)
245168,
247126 |
Rs. 56,72,36,502/- |
01/04/2010 |
|
| |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
September 2008. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor Rs. in Crore |
Scheduled
date
of
comple
tion |
| NIL |
|
| |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
August 2008. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor Rs. in Crore
|
Scheduled
date
of comple tion |
| NIL |
|
| |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
July 2008. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date of comple tion |
| NIL |
|
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
June 2008. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date
of comple tion |
|
1. ERO/MMD/
MKT
/077 |
Construction of Garment Park at
Howrah,WB |
Open |
22.04.08 |
Two
Bid |
12.05.08 |
Three(3)
|
Three(3) |
NIL |
Yes(L-1) |
ERO/MMD/595/
0774 dated
04.06.2008 |
M/s Adhunik Infrastrus
tures
(P)
Ltd.,
Kolkata |
Rs. 66.70 Crores + Rs.
3.63 Crores
against
provisional
sm |
18 months |
|
1. ERO/MKT/
GR-11/11
dated 08.11.07
|
Construction of Fakharuddin Ali
Ahmad
Medical College at
Borpeta, Assam. |
Open |
17.10.07 |
Two
Bid
(Pre-Tender Tie up) |
07.11.07 |
Three(3)
|
Three(3) |
NIL |
Yes(L-1) |
ERO/MMD/598/
0783 dated
09.06.2008
|
M/s Shree Gautam
Construction
Co. Ltd.,
Guwahati |
Rs. 134.12 Crores |
24 months |
|
| |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
May 2008. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date
of comple tion |
|
ERO/MMD/
576/0777 |
Construction of Central Prison at
Bishalgarh Tripura |
Open |
29.04.08 |
Two
Bid |
09.05.08 |
Three
|
Three |
NIL |
Yes |
ERO/MMD/576/
0777 dated
29.05.08 |
M/s Evershine Vaniyya Exports (P)
Ltd., Kolkata |
Phase-I - Rs. 28.00 Crores Phase-II -
Rs. 29.80 Crores |
17 months |
|
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
April 2008. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &
Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date
of comple tion |
|
1. SRO/MKT/F/04 |
Site grading,
construction
of roads,
storm water
drain &
compound wall for
phase-III
Refinery Project,
part
(A&B)
|
Open |
25.01.08 |
Two |
05.02.08 |
3 nos.
|
1. M/s Singam Projects
Ltd.,
Hyderabad 2. M/s AMR
Constructions Ltd.,
Hyderabad 3. M/s Sri
Chennakesava
Constructions Ltd.,
Hyderabad |
NIL |
Yes |
LOI No.
SRO
/MMD/F/04 -524 dt.
03.04.08 |
M/s
M/s AMR Constructions
Ltd.,
Hyderabad 3. M/s
Sri |
76,17,24,899 |
14 months |
|
2. SRO/MKT/F/04-GEN |
Package no. 2/2007
Dummugudm
NSP Tailpond
link canal to lift work
from
river Godawari
to
Nagarjuna Sagar Tail
Pond excavation of Gravity canal to carry 24000
cusecs from pump house no. 1 near
Maddulagudem
(V) upto the road
connecting
Krishnasagaram (V) &
Mannuguru Road including
CM&CD
works |
Open |
08.10.07 |
Two |
12.10.07 |
3 nos.
|
1. M/s
AMR Constructions Ltd.,
Hyderabad
2. M/s Indu Project Ltd.,
Hyderabad 3. M/s R.
Venkataramaiah,
Hyderabad |
1. M/s
GEO Found- ation |
Yes |
LOI No. SRO/(PCO)
MKT/F-04-
104
dt.
17.04.088 |
M/s
AMR Constructions Ltd.,
Hyderabad |
164,27,52,021 |
54 months |
|
| |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
March 2008. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &
Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in Crore |
Scheduled
date
of comple tion |
|
1. DLI/
ENGG/
01/577
/01 dt. 06.02.08 |
Modernised
check post/Civil Construction |
Open |
06.02.2008 |
Two |
27.02.08 |
3
nos.
|
1. M/s CMAT 2. M/s Double
Dee Const 3. M/s M.P. Khaitan. |
NIL |
Yes |
LOI No.
ERO /MMD/577 /0759 dt.
10.03.08 |
M/s Coal
Mines Associated Traders, Kolkata |
33.24 |
16
months |
|
2. 2007/ Workshop
Project ENGG /WT-2 |
Pre-Tender
Tie- Up for the Work of Construction of carriage
periodic for BG Railway Coaches at Harnut,
Nalanda |
Open |
16.06.07 |
Two |
09.07.07 |
4
nos.
|
1. M/s RDS Projects 2. M/s
GPT Infra 3. M/s Adhunik Inf 4. M/s GEO
Foundation. |
1. M/s
GEO Found- ation |
Yes |
LOI No. ERO/
MMD/
565/
0765
dt.
11.03.088 |
M/s GPT
Infra-projects Ltd. Kolkata |
81.77 |
27.08.09 |
|
3. Project No.586 |
Pre-Tender
Tie-Up for the Work of Construction and
Development of Phase-I of West Campus of GGSIPU
at Sector -16 C, Dwarka, New Delhi |
Open |
10.09.07 |
Two |
08.10.07 |
3
nos.
|
1. M/s Shree Gautam Const.
Ltd. 2. M/s KSM Bashir Mohd & sons
3. M/s Jaichandlal Singhi. |
NIL |
Yes |
LOI No.
NRO/ CON/ 586/
467
dt. 10.03.088 |
M/s Shree
Gautam Construction Co. Ltd. A.T. Road, Nr.
Railway Gate No. 6, Guwahati- 781 009
(Assam) |
55.64 |
17
months |
|
|
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
February 2008. |
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi
cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders
recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &Date |
Name
of Contractor |
Value
of Contr
actor Rs. in Crore |
Scheduled
date
of
comple
tion |
| NIL |
|
| |
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
January 2008. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No
. &Date |
Name
of Contractor |
Value
of Contr
actor
Rs. in
Crore |
Scheduled
date
of comple tion |
|
1.SRO/MKT
/F/04-GEN |
Major Irrigation work at Nellore District Modernization of pennar Delta System & Reconstruction of all existing structures including maintenance for a period of two years after completion of the work for Package-40 |
Open |
19.09.2007 |
Two |
24.09.2007 |
3 nos.
|
1) M/s Y.V.Sesha Reddy, Nellore
2) M/s Goutham
Const. Anantapur
3) M/s R.Venkataramaiah, Hyderabad |
NIL |
Yes |
LIO No.SRO
(PCO)/
MKT/F/04-
102 dt.
07.01.2008 |
2) M/s Goutham
Const. Anantapur |
Rs.
43,63,13,207.50 |
24 months |
|
2. SRO/MKT
/F/04-GEN
|
Civil work for PMP,DIP & CPP and other infrastructure facilities of EDP |
Open |
27.06.2007 |
Two |
16.07.2007 |
3 nos.
|
1) M/s BBIPL Infrast.India Ltd. Bangalore
2) M/s Binco
Const Pvt. Ltd., Bangalore
3) M/s K.Damodar Bangalore |
NIL |
Yes |
LIO No.SRO
/MKT/F/04-
502 dt.
21.01.2008
|
M/s BBIPL Infrast.India Ltd. Bangalore |
Rs.
43,14,64,070.57 |
16 months |
|
| Details of Contracts valuing
Rs. 25 Crores and above concluded during the Month
December 2007. |
|
Tender
No. |
Item/Nature
of Work |
Mode
of Tender Enquiry |
Date
of Publi cation
of
NIT |
Type
of Bidding (Single/
Two
Bid System) |
Last
date of receipt of Tender |
Nos.
of
tenders recd. |
Nos.
and
names
of
Parties qualified
after
technical
evaluation |
Nos.
and names of Parties not qualified after
technical evaluation |
Whether
contract awarded to lowest tenderer/ Evaluated
L1 |
Contract
No. &
Date |
Name
of Contractor |
Value
of Contr
actor |
Scheduled
date
of comple tion |
|
SRO
/MKT
/F/04-GEN |
Excavation
of Approach Channel from Siddeswaram to the Pump
house near Mutchumarri and excavation of Link
Channel from Pump House near Mutchumarri to
P.S.I.(Pump Station No. 1) near Mallayala (V)
along FRL contour of Srisailam including
excavation of approach channel from (-) 3.722 to
km (-) 1.922 from (+) 261.900 level to (+)
250.000 level including construction of CM &
CD works etc. complete as per parameters
mentioned in the schedule. |
Open |
05.07.07 |
Two |
04.08.07 |
3
nos.
|
1) M/s AMR Constru
ctions
Ltd, Hyderabad. 2) M/s
Rithwik Projects Ltd. Hyderabad. 3) M/s Indu
Projects Ltd., Hyderabad. |
NIL |
Yes |
LOI
no. SRO(PCO) /MKT/F/ 04-101 dt.
03.12.07 |
M/s AMR
Construc tions Ltd. Hyderabad |
Rs.
83,29,24 ,529/- |
18
months |
|
|
|
On this page the Website Materials are Statements
related to the recent award of contracts of value Rupees
Twenty Five Crores and above to various agencies,
suppleiers, etc. EPI assumes no responsibility for any
discrepancies that have been transmitted with the
elctronic version. This Website Material has been
prepared for convenience of refrence only (and has no
offical sanctity). EPI makes no warranty or
respresentation regarding the accuracy and completeness
of any Website Materials, and such Website Materials are
provided "as is " and without any warranties of any
kind, either express or implied or statutory.
EPI shall not be liable for, authorized or
unauthorized, usage of the presented material, and users
by using the same expressly agree to indemnify, EPI
against any and all claims, expenses, damages and
liabilities arising out of the materilas by such users,
including any and all direct, indirect, incidental,
special or consequential damages.
|
|
|
|
|
|
|
|